Agile utility construction contractor · Florida

Built to adapt. Ready to deliver.

Reliable. Agile. Built for what’s underground.

Directional drilling, underground infrastructure and fiber installation for utility and infrastructure partners across Florida.

A Magellan Group Company

1M+feet installedto verify
80/20drilling / fiber pullingto verify
72htypical mobilizationto define
FLactive · 5 states targetedtarget

Core capabilities

Three lines of work, one crew structure.

HDD
0 FT -8 FT
01

Horizontal directional drilling

80% of mix

Directional boring, conduit installation, road and utility crossings — without opening the road.

02

Underground utility construction

Trench & bore

Trenching, missile boring, conduit placement, handholes and vaults, excavation and restoration.

03

Fiber installation

20% of mix

Fiber pulling, fiber blowing, cable placement and drops.

04

Field coordination

Differentiator

Production reporting, billing documentation and permitting coordination. The prime receives the paperwork ready to file.

Verticals we serve

Four utilities. One underground discipline.

Every vertical below runs through the same ground, under the same permits, with the same locate rules. What changes is the product in the conduit — and the standard it has to meet.

Water

Potable water mains, force mains, service lines and casing crossings under road and rail.

Scope to confirm

Power

Duct bank and conduit for distribution feeds, substation ties and secondary services.

Scope to confirm

Oil & Gas

Steel and PE gas mains, cased crossings and regulated bores to operator specification.

Scope to confirm

Fiber & Cable

Backbone and distribution conduit, pulling, blowing, cable placement and drops.

Active · 20% of mix

Why Magellan UC

Lean operation, structured contractor discipline.

Group

Backed by AMT and A3

Equipment access and maintenance handled in house, across the Magellan Group.

Control

Field documentation

Production reports and billing reach the prime organized and on time.

Onboarding

Vendor onboarding

Registration, insurance and compliance paperwork handled for your procurement portal.

Mobilization

Equipment on site in days, not weeks.

A lean structure means decisions without a committee. Short windows and pilot projects are where this company wins.

Projects

Spec sheet, not a marketing case.

Three of our own jobs. Nothing from BlueOcean appears here — §21 of the brief. specs pending

Crew setting up a road crossing

Highway crossing

ScopeHDD · conduit
Length1,480 LF
DiameterØ 12"
Duration6 days
Technician locating the bore path before fiber pull

Fiber backbone

ScopePulling · blowing
Lengthto be provided
Diameterto be provided
Durationto be provided
Conduit and pulling head in an open trench

Utility relocation

Scopeto be provided
Lengthto be provided
Diameterto be provided
Durationto be provided

Ready when you are

Let’s talk about your project.

Tell us the scope, the mobilization window, and attach the drawings. The answer comes from the people who run the job.

  • Apopka, Florida4350 Hogshead Road, FL 32703
  • +1 (321) 285-5022Monday to Friday, 7:00 am – 5:00 pm
  • info@magellanuc.comBid invitations and vendor onboarding

We reply from a Magellan UC address. Your files are not shared outside the estimating team.